Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19NG0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19NG0010","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAGALLANES RIVER / BRGY. MAGALLANES, CLAVER, SURIGAO DEL NORTE STA.0+000.00 - STA.0+196.80","Flood Control and Drainage","Completed",19599348.56,0,100,"Surigao del Norte 2nd DEO","Region XIII","CHARLZ CONSTRUCTION, INC. (8709)","2019-06-11","2019-09-19",2019,"Regular Infra - GAA 2019 OO-2",9.57474,125.71312,"1606706000","1606700000"]
SHA-256
335293cde207010a02dfdd02852816e41274283f716b1a4b233e3322bd32a62c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.