Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20AB0104

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20AB0104","CONSTRUCTION OF GAANG RIVER FLOOD CONTROL, BRGY. GAANG, CURRIMAO, ILOCOS NORTE","Flood Control and Drainage","Completed",13576139.97,0,100,"Ilocos Norte 2nd DEO","Region I","CURRIMAO CONSTRUCTION & DEVELOPMENT, INC. (5129)","2020-10-12","2021-04-29",2020,"Regular Infra - GAA 2020 LP",17.99527,120.49976,"102808000","102800000"]
SHA-256
0d1e011944d5f7f803112282f61fd1f9bd4089077172bb0b6b6511bcbff910ed

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.