Project 20AI0051

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20AI0051","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA RIVER, BRGY. LA PAZ-SAN LEON, UMINGAN, PANGASINAN","Flood Control and Drainage","Completed",9307880.56,0,100,"Pangasinan 3rd DEO","Region I","APP CONSTRUCTION AND SUPPLIES (42160)","2020-10-05","2021-01-22",2020,"Regular Infra - GAA 2020 OO-2",15.91764,120.73743,"105544000","105500000"]