Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20DK0042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20DK0042","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ALITAO RIVER, TAYABAS CITY-QUEZON","Flood Control and Drainage","Completed",9800000,0,100,"Quezon 1st DEO","Region IV-A","ANNCON BUILDERS (36097)","2020-11-27","2021-02-22",2020,"Regular Infra - GAA 2020 OO-2",14.00716,121.60532,"405647000","405600000"]
SHA-256
41ce77daeffb2f941e089c0498a8da3a7099770b4d6cbe67c3ea88bc8cd6306d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.