Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20F00035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20F00035","LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION/REHABILITATION OF KAMANITOHAN RIVER FLOOD CONTROL DIKE(BRGY. ITBA","GAA 2020 LP","Completed",157082330.78,0,100,"Region V","Region V","NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION (40088) / ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2020-12-07","2021-12-15",2020,"Regular Infra - GAA 2020 LP",13.12147,123.87427,"500511000","500500000"]
SHA-256
f452779a73a2397c2a8c63914a90d718f5e97e3d65122bbce3880a867c3be9b3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.