Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20FO0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20FO0021","CONSTRUCTION/REHABILITATION OF CABILOGAN RIVER COURSE (SAN AGUSTIN SECTION) ( DOWNSTREAM OF DAM), LEFT SIDE, LIBON, ALBAY","Flood Control and Drainage","Completed",17640000,0,100,"Albay 3rd DEO","Region V","ELKANKONSTRAK DEVELOPMENT CORPORATION (26220)","2020-12-07","2021-05-15",2020,"Regular Infra - GAA 2020 OO-2",13.32526,123.41809,"500507000","500500000"]
SHA-256
cbb558a0582db155516e48c90c903ecc0aa3e36a00a9e74cbf12b48617cfe69c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.