Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20FO0085

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20FO0085","REHABILITATION/IMPROVEMENT OF BACOLOD FLOOD CONTROL STRUCTURE (LEFT SIDE FACING DOWNSTREAM OF BACOLOD BRIDGE) IN LIBON, ALBAY","Flood Control and Drainage","On-Going",9603059.86,0,73.16,"Albay 3rd DEO","Region V","ELKANKONSTRAK DEVELOPMENT CORPORATION (26220)","2020-10-05",null,2020,"Regular Infra - GAA 2020 LP",13.26667,123.44333,"500507000","500500000"]
SHA-256
dcfdd579e94a0616646f273fd1a207ab716265db64de87965b0b1c0196742ea6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.