Project 20HB0039
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20HB0039","ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS TAGBILARAN EAST RD (TAGBILARAN - JAGNA) KO173 + 200 -KO174 + 030, KO181 + 972 - KO182 + 615, KO182 + 681 -","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP","Completed",34319401.78,0,100,"Bohol 3rd DEO","Region VII","L.M. BALTONADO CONSTRUCTION (30238)","2020-12-15","2021-09-04",2020,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP",9.77615,124.50082,"701223000","701200000"]
SHA-256
7b99a1716b71ec67f8ba9c793a3bf9218d11320ebf6c8da469b04b892751e52eHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.