Project 20HB0041
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20HB0041","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF ALEJAWAN FLOOD CONTROL (JAGNA SIDE),ALEJAWAN,JAGNA, BOH","Flood Control and Drainage","Completed",18992386.55,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2020-02-26","2020-08-03",2020,"Regular Infra - GAA 2020 OO-2",9.68304,124.39723,"701225000","701200000"]
SHA-256
20b65550a301f378e548acb3ac0e6890a476a4b089d5c7392ab0de704bd9b63dHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.