Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20HB0042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20HB0042","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF NAATANG SEAWALL, NAATANG, JAGNA, BOHOL STA. 0+000 - STA. 0+305","Flood Control and Drainage","Completed",18988259.9,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2020-03-03","2020-08-09",2020,"Regular Infra - GAA 2020 OO-2",9.67395,124.39926,"701225000","701200000"]
SHA-256
aaf3cbba2590302e812978ef676c1566c92d0c341a0df069c5cd91e891fd592b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.