Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20J00105

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20J00105","ROAD UPGRADING GRAVEL TO PAVED CONSTRUCTION OF MISSING LINKS - NALIL - SIKIAT ROAD, TAWI-TAWI","Roads","Completed",43436142.04,0,100,"Region IX","Region IX","M. ABUBAKAR CONST. AND ENGINEERING, INC. (36365)","2020-07-30","2021-04-23",2020,"Regular Infra - GAA 2020 LP",5.02056,119.75522,"1907002000","1907000000"]
SHA-256
793592f716882801fa7f9b3f4a9f2292d9d72db8963e58d21b174569e8ffee9a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.