Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20KG0073

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20KG0073","FLOOD CONTROL STRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE,BRGY. PINUYAK, LALA, LANAO DEL NORTE","Flood Control and Drainage","Completed",9769730.28,0,100,"Lanao del Norte 2nd DEO","Region X","AL-FAHDEL CONSTRUCTION & ENGINEERING (17953)","2020-09-24","2021-01-13",2020,"Regular Infra - GAA 2020 LP",7.91296,123.74783,"1003509000","1003500000"]
SHA-256
1da192d40ce80fdec7fe63f9efcc015b23b4734a93382d027a57ec40d36a86cb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.