Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20LH0043

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20LH0043","RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE AT SUAWAN BRIDGE (B00212MN) ALONG DAVAO-BUKIDNON RD, DAVAO CITY","Bridges","Completed",28498965.43,0,100,"Davao City 2nd DEO","Region XI","DREIRICH BUILDERS (39521) / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY) (10433)","2020-02-22","2020-08-27",2020,"Regular Infra - GAA 2020 OO-1",7.24715,125.35283,"1130700000","1102400000"]
SHA-256
6328da6c37a051bc2e95195d236fd35c2f48b60c630310d1fe875cfc5df75a64

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.