Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20MD0017

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20MD0017","CONSTRUCTION OF CENTRAL LABAS FLOOD CONTROL ALONG LIBUNGAN RIVER (PHASE II), MIDSAYAP, COTABATO","GAA 2020 OO-2","Completed",32541880,0,100,"Cotabato 1st DEO","Region XII","FFJJ CONSTRUCTION (16712) / SUNSTONE CONSTRUCTION & SUPPLY (11122)","2020-02-14","2021-02-26",2020,"Regular Infra - GAA 2020 OO-2",7.22104,124.45686,"1908708000","1908700000"]
SHA-256
f24dd7a398115d885f83874fdc82e46c12490d03d36d80f1cac825f8d019bfb8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.