Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20NI0034

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20NI0034","OFF-CARRIAGEWAY IMPROVEMENT-SECONDARY ROADS SURIGAO-DAVAO COASTAL RD. K1459+750-K1460+814","Roads","Completed",38218967.8,0,100,"Surigao del Sur 2nd DEO","Region XIII","MADYAW CONSTRUCTION & DEV. CORPORATION (29598)","2020-08-18","2021-03-22",2020,"Regular Infra - GAA 2020 OO-1",8.21446,126.31119,"1606803000","1606800000"]
SHA-256
e0081413b88f5f6be25d3a8d0b123c40d22b3741672e1d1fee6013a0d14b0bc9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.