Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20PA0121

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20PA0121","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF STA. ROSA FLOOD CONTROL PROJECT, STA.0+000-STA.0+485, B","Flood Control and Drainage","Completed",51020421.87,0,100,"Abra DEO","Cordillera Administrative Region","R.A. FANGLAYAN (RAF) GENERAL CONSTRUCTION INC. (FORMERLY:RAF GENERAL CONSTRUCTION) (06699)","2020-11-23","2021-06-26",2020,"Regular Infra - GAA 2020 OO-2",17.58558,120.60294,"1400101000","1400100000"]
SHA-256
8acc2e4549bbb97c0af9ad281ac5127196521fcb90e952d9e8f8dbef7918c4d1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.