Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20PI0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20PI0015","CONSTN OF FLOOD CONTROL ALONG CHICO RIVER, TOCUCAN, BONTOC, MOUNTAIN PROVINCE","Flood Control and Drainage","Completed",14997920,0,100,"Mountain Province 1st DEO","Cordillera Administrative Region","JYP CONSTRUCTION (39535)","2020-11-16","2021-04-30",2020,"Regular Infra - GAA 2020 OO-2",17.11491,121.01602,"1404404000","1404400000"]
SHA-256
02875ae7b58ddec9545a76e302ee6fa0370a28cd22cda9ceebc39c578bc6970c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.