Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21A00021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21A00021","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MARIA RIVER, BRGY. NAGTUPACAN, STA. MARIA, ILOCOS SUR","Flood Control and Drainage","Completed",37473837.64,0,100,"Region I","Region I","MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION) (11363)","2021-03-15","2021-12-31",2021,"Regular Infra - GAA 2021 OO-2",17.37996,120.46938,"102926000","102900000"]
SHA-256
70fc7a840168dfd28d438bb793c998f3b2c6471a9a9a9082cf6b4ddaaf8a08fa

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.