Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21BI0020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21BI0020","LOCAL PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF FLOOD CONTROL, BOLIWAO-NALUBBUNAN RIVER ALONG MAGAT RIVER, BARANGAY BOLIWAO-BARANGAY NALUBBUNAN","Flood Control and Drainage","Completed",14850000,0,100,"Nueva Vizcaya DEO","Region II","REGG'S BUILDERS (33262)","2021-02-08","2021-06-22",2021,"Regular Infra - GAA 2021 LP",16.50963,121.23232,"205011000","205000000"]
SHA-256
7c8d4c11c9d2dcff9304f171c5fb2bd32b09000b9c2b6c41019ca613a066452b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.