Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21C00060

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21C00060","NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION), PACKAGE 6, PROVINCE OF PAMPANGA","Bridges, Roads","Completed",211660450.97,0,100,"Region III","Region III","TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC (9650)","2021-04-21","2022-12-24",2021,"Regular Infra - GAA 2021 OO-1",14.90927,120.60597,"305408000","305400000"]
SHA-256
381055d9adf1fc4556cb56b610ba6e614d46ac4590362dbca8961d2664804d0f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.