Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21DB0103

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21DB0103","CONSTRUCTION OF ROAD, BARANGAY BOLBOK, TUY, BATANGAS","Roads","Completed",1919530.64,0,100,"Batangas 1st DEO","Region IV-A","W. RIVERA CONST. AND EQUIPT. RENTALS, INC. (FORMERLY: W. RIVERA CONSTRUCTION & EQUIPMENT RENTALS) (31378)","2021-02-26","2021-05-26",2021,"Regular Infra - GAA 2021 LP",14.02091,120.75601,"401034000","401000000"]
SHA-256
a9af68d1cb5d4be67b074d71dccfac776db596163769a325aae63e6542783f7c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.