Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21DH0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21DH0010","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CONSTRUCTION OF RIVER CONTROL ALONG PAGSANJAN RIVER, BRGY. MAGDAPIO, PAGSANJAN, LAGUNA","Flood Control and Drainage","Completed",93603640.05,0,100,"Laguna 1st DEO","Region IV-A","NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2021-04-05","2022-05-10",2021,"Regular Infra - GAA 2021 OO-2",14.2698,121.45957,"403413000","403400000"]
SHA-256
33686c9a46e78db9646ff5846818bdabb10fc9b4bb962750971fbb165b8dfd80

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.