Hashed input (canonical JSON of the source row)
["dpwh","21DI0038","CONSTRUCTION OF RIVER CONTROL NEAR BAYANBAYAN BRIDGE, BRGY. SAN ANTONIO AND BRGY. SAN VICENTE, SAN PEDRO CITY, LAGUNA","Flood Control and Drainage","Completed",48990322.88,0,100,"Laguna 2nd DEO","Region IV-A","MAR-VEL CONSTRUCTION & SUPPLY (23722)","2021-02-24","2021-11-11",2021,"Regular Infra - GAA 2021 OO-2",14.34401,121.0202,"402106000","402100000"]
SHA-256
a2e2bc4bcf9390c95e92d5da74e9da27ed813d6e1007852a8b1a28d851729fb8