Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FB0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FB0021","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM, STA. 0+000 - STA. 0+580, BARANGAY BALABAGON, MANITO, ALBAY","Flood Control and Drainage","Completed",29398270.5,0,100,"Albay 2nd DEO","Region V","NUMERICAL GATE CONSTRUCTION & SUPPLY CORPORATION (34122)","2021-02-12","2021-06-25",2021,"Regular Infra - GAA 2021 OO-2",13.12013,123.91304,"500511000","500500000"]
SHA-256
1deae394d308b9cb200feb508738d39ffbe3f2ddbae49876e26ff5e24e01fe69

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.