Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FG0032

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FG0032","CONSTRUCTION/IMPROVEMENT OF RANGAS RIVER FLOOD MITIGATION STRUCTURE  DOWNSTREAM: STA.0+360.00 - STA.0+560.00  GOA, CAMARINES SUR","GAA 2021 OO-2","Completed",13130021.56,0,100,"Camarines Sur 4th DEO","Region V","CBC CONSTRUCTION AND SUPPLY INC. (FORMERLY: CBC CONSTRUCTION & SUPPLY) (38169)","2021-03-08","2021-09-08",2021,"Regular Infra - GAA 2021 OO-2",13.67616,123.5029,"501715000","501700000"]
SHA-256
01adc8c638b33b64ec747ccff4d58df4c51c65eac01d46e499e754983f92c87e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.