Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21IA0004

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21IA0004","CONSTRUCTION OF SANTOL FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD (124.472083, 11.479808 TO 124.472083, 11.479812)","Flood Control and Drainage","Completed",19033600,0,100,"Biliran DEO","Region VIII","YOYEN ENTERPRISES (15541)","2021-02-09","2021-04-24",2021,"Regular Infra - GAA 2021 OO-2",11.48058,124.47168,"807802000","807800000"]
SHA-256
a78d9fb793c2739070f508d74a227c64fc0a36aa8085c585140aef90225db0ae

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.