Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21IB0063

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21IB0063","CONSTRUCTION OF BALANGIGA FLOOD CONTROL ALONG BALANGIGA RIVER, BALANGIGA, EASTERN SAMAR","Flood Control and Drainage","Completed",48999999.13,0,100,"Eastern Samar DEO","Region VIII","PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)","2021-02-18","2021-08-10",2021,"Regular Infra - GAA 2021 OO-2",11.11568,125.38646,"802602000","802600000"]
SHA-256
911b58b6094dfc443344103e6f1f6784347e05cedcf29dfbe07883538489eaaf

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.