Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21KK0121

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21KK0121","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BALATUKAN RIVER (PHASE 1), BARANGAY NAPALIRAN, BALINGASAG, MISAMIS ORIENTAL","Flood Control and Drainage","Completed",19795000,0,100,"Misamis Oriental 1st DEO","Region X","ONE NINE ONE TRADING (44468)","2022-07-05","2022-12-01",2021,"Regular Infra - GAA 2021 LP",8.77717,124.80723,"1004313000","1004300000"]
SHA-256
f16125ee94eebd40f8ca1e66d1e52cc320b70c6db50c4bb72ad7624d80766cac

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.