Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21KK0139

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21KK0139","CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAINWATER COLLECTOR SYSTEM","Water Provision and Storage","Completed",4394802.61,0,100,"Misamis Oriental 1st DEO","Region X","DICON BUILDERS CORP. (33181)","2022-12-05","2023-03-13",2021,"Regular Infra - GAA 2021 CSSP",8.93414,124.98544,"1004319000","1004300000"]
SHA-256
3d31ad168bfaaac8cbfae0ed969dd00ecb2a193add48cb03d7983bc081e531ed

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.