Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21LB0325

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21LB0325","CONSTRUCTION OF 4-STOREY, 28CL (U-TYPE) SCHOOL BUILDING AT DON JULIAN RODRIGUEZ SR. ES, BRGY. GOV. VICENTE DUTERTE, DAVAO CITY","Buildings and Facilities","Completed",34650000,0,100,"Davao City DEO","Region XI","A.Y.U. ENGINEERING & CONSTRUCTION (25632)","2022-01-10","2023-10-05",2021,"Regular Infra - GAA 2021 LP",7.08983,125.62762,"1130700000","1102400000"]
SHA-256
a9c70a969bec547a2705967eb77a403d74c11c3873d6114c4b89b44b8aa4e204

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.