Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21LB0394

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21LB0394","CONSTRUCTION OF WATER SYSTEM AT PUROK STO. NIÑO, BRGY. ACACIA, DAVAO CITY","Water Provision and Storage","Completed",7840409.54,0,100,"Davao City DEO","Region XI","EDSAL CONST. AND SUPPLY INC. (47523)","2022-04-13","2022-07-26",2021,"Outside Infra - Trust Funds 2021",7.20527,125.60168,"1130700000","1102400000"]
SHA-256
80707f3b2d87b7b176a5890ca30e40876a3bec3d17afa701f00de42958e57c80

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.