Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21LG0004

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21LG0004","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BITANAGAN  RIVER , MATI, DAVAO ORIENTAL","Flood Control and Drainage","Completed",9800000,0,100,"Davao Oriental 2nd DEO","Region XI","VERTICAL BUILDERS (14029)","2021-03-08","2021-07-29",2021,"Regular Infra - GAA 2021 OO-2",6.96721,126.27821,"1102509000","1102500000"]
SHA-256
d47be75f3c1e35de4f171e76c0565a4eafaea97d0bb4cd9538c3aab6174be123

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.