Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21MB0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21MB0021","CONSTRUCTION OF FLOOD CONTROL/CONCRETE REVETMENT ALONG MAKAR RIVER (PHASE 2), BARANGAY LABANGAL, GENERAL SANTOS CITY","Flood Control and Drainage","Completed",48998990.7,0,100,"South Cotabato 1st DEO","Region XII","JDRC CONSTRUCTION & SUPPLIES, CORP. (33869)","2022-03-08","2022-09-30",2021,"Regular Infra - GAA 2021 OO-2",6.09514,125.14133,"1230800000","1206300000"]
SHA-256
016882d50a23c39bb04ce2641ce0c81578c68e4d166049eadeaacc723da63cf0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.