Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21ME0052

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21ME0052","REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG MAITUM-LAKE SEBU ROAD K1778+050 - K1778+100, K1778+150 - K1778+210, K1778+250 - 1778+290; MAITUM, SARANGANI PROVINCE","Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Rehabilitation - PCCP","Completed",33801935.01,0,100,"Sarangani DEO","Region XII","F.H. GOPITEO CONSTRUCTION & SUPPLY (21336)","2021-03-24","2021-11-23",2021,"Regular Infra - Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Rehabilitation - PCCP",6.15057,124.46943,"1208005000","1208000000"]
SHA-256
d19ce81b7258e53fda3d1936d6bd9c6fb6effd17a01d535fe45436124b2bf78b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.