Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21P00116

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21P00116","(1) RECONSTRUCTION OF THE BAMBOO FOOTBRIDGE AT SAMANG CREEK, SAKKI-ING FOOTBRIDGE AND KALIMANGOWAN FOOTBRIDGE, SITIO PAYAO, BRGY. LOWER UMA, LUBUAGAN, KALINGA(2) RECONSTRUCTION OF SUKLAP SUSPENSION FOOTBRIDGE, SUKLAP, BRGY. TANGLAG, LUBUAGAN KALINGA(3","Bridges","Completed",19330204.5,0,100,"Cordillera Administrative Region","Cordillera Administrative Region","HKBT CONSTRUCTION (48936)","2021-11-02","2023-07-12",2020,"Outside Infra - GAA 2020 NDRRMF",17.36625,121.20253,"1403206000","1403200000"]
SHA-256
0b74b5ac242721df01310330901653d5e3d1694d98bfb44ea5019338b6ae570e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.