Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21PC0025

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21PC0025","BRIDGE PROGRAM-REHABILITATION/MAJOR REPAIR-MUSLIM BRIDGE 2 (B01048LZ) ALONG CLAVERIA-CALANASAN-KABUGAO ROAD, CALANASAN, APAYAO","Bridges","Completed",9702000,0,100,"Apayao 2nd DEO","Cordillera Administrative Region","ALEPHNORTH PEAK CONSTRUCTION AND DEVELOPMENT CO. (45344)","2021-02-24","2022-06-24",2021,"Regular Infra - GAA 2021 OO-1",18.44878,121.09513,"1408101000","1408100000"]
SHA-256
dddb989461ac762e017111895bd65d0800e83429bc6002cc8f5970cd91a3f5ee

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.