Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21PE0001

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21PE0001","CONSTRUCTION OF FLOOD MITIGATION STRUCTURES WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER SECTION 13 (MINAC), STA. 176+125 - STA. 176+340, BOKOD, BENGUET","Flood Control and Drainage","Completed",12216415.32,0,100,"Benguet 1st DEO","Cordillera Administrative Region","M.P. TABERAO CONSTRUCTION SERVICES AND SUPPLIES (46017)","2021-03-15","2021-08-23",2021,"Regular Infra - GAA 2021 OO-2",16.44957,120.72479,"1401104000","1401100000"]
SHA-256
d14f27856fbadc7814cff6344e9935b6f349c411201b577106897b85fcea7314

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.