Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21PE0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21PE0012","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER SECTION 30 (BESSANG), STA. 209+880 - STA. 210+380, KABAYAN, BENGUET","Flood Control and Drainage","Completed",9745805.43,0,100,"Benguet 1st DEO","Cordillera Administrative Region","VANVIN CONSTRUCTION AND SUPPLY (42696)","2021-03-01","2021-08-04",2021,"Regular Infra - GAA 2021 OO-2",16.66056,120.81646,"1401107000","1401100000"]
SHA-256
0ba83343d0a951d9aabf74d0e8d32b85166b26d5d458c14e9b318d7ea0f6ae15

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.