Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21PF0016

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21PF0016","CONSTRUCTION OF PAPASOK-SIBUGAN FLOOD CONTROL STA.5+360 - STA. 5+863 (L.S.), BUGUIAS, BENGUET","Flood Control and Drainage","Completed",19600000,0,100,"Benguet 2nd DEO","Cordillera Administrative Region","AAAL CONSTRUCTION (46450)","2022-01-19","2022-07-22",2021,"Regular Infra - GAA 2021 OO-2",16.78579,120.83297,"1401105000","1401100000"]
SHA-256
9a3e423c9af0ec64f380c8082e80630c2e6b10c09ce009ede994fa317ef3e2fb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.