Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21PL0061

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21PL0061","IMPROVEMENT OF MENCIO STREET DRAINAGE CANAL SYSTEM, BULANAO, TABUK CITY, KALINGA","Flood Control and Drainage","Completed",1843334.05,0,100,"Lower Kalinga DEO","Cordillera Administrative Region","JAG FOUR CONSTRUCTION (42007)","2021-03-19","2021-05-12",2021,"Regular Infra - GAA 2021 LP",17.41581,121.44638,"1403213000","1403200000"]
SHA-256
421cc963df8e7404f587543b90587a9436bc0209256783c845ffb0f2694130f1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.