Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22AE0038

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22AE0038","BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (PHASE I), BARANGAY BULALAAN, SUDIPEN, LA UNION","Flood Control and Drainage","Completed",7542531.5,0,100,"La Union 1st DEO","Region I","H.G. LOPEZ CONSTRUCTION (17691)","2022-02-15","2022-05-23",2022,"Regular Infra - GAA 2022 CSSP",16.82257,120.49706,"103319000","103300000"]
SHA-256
a45c716c2f794b4467489e6427299469e729d677a6fda22ba93eca7c670cc33d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.