Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CA0016

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CA0016","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND  DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG PENTOR-BALSIK-CAULAMAN RIVER, SAN SIMON SECTION,  PHASE ERD- 1, DINALUPIHAN, BATAAN","Flood Control and Drainage","Completed",24499998.64,0,100,"Bataan 1st DEO","Region III","AS MACHA CONSTRUCTION AND TRADING (36878)","2022-02-08","2022-05-16",2022,"Regular Infra - GAA 2022 OO-2",14.91312,120.48379,"305406000","305400000"]
SHA-256
ea7d8783db3131d2c1e8dbd1b7b3ff9b906df376f507d4414f4051cdbbb671d7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.