Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CE0080

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CE0080","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANCO RIVER, BRGY. MACAPSING, RIZAL, NUEVA ECIJA","Flood Control and Drainage","Completed",48743822.95,0,100,"Nueva Ecija 1st DEO","Region III","IRC CONSTRUCTION & SUPPLIES (29943) / SYMMETRICON BUILDERS CORP. (37555)","2022-02-22","2022-06-24",2022,"Regular Infra - GAA 2022 OO-2",15.67174,121.13432,"304923000","304900000"]
SHA-256
9cb8c95ae9ff29641c6fd544a9f02cd3c0efdae8b1a7dddbea810a8e08cfffad

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.