Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CH0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CH0040","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/REHABILILTATION OF SLOPE PROTECTION ALONG PORAC RIVER, POBLACION SECTION, FLORIDABLANCA, PAMPANGA","Flood Control and Drainage","Completed",48840963.08,0,100,"Pampanga 2nd DEO","Region III","TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC (9650)","2022-04-18","2022-10-14",2022,"Regular Infra - GAA 2022 OO-2",14.97966,120.5323,"305406000","305400000"]
SHA-256
664c34876ecdaf9b2529ca46edc3fc3bd6f7f23eb71a451160ea4071e44c961d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.