Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22DE0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22DE0018","CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SITIO ILAYA, MABILOG NA BUNDOK, LOB","GAA 2022 CSSP","Completed",49000000,0,100,"Batangas 2nd DEO","Region IV-A","EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION (45033) / TCSC CORP. (15453)","2022-01-28","2023-01-02",2022,"Regular Infra - GAA 2022 CSSP",13.65199,121.22519,"401015000","401000000"]
SHA-256
5aa4a70d3560457f5e0fdf64a40cde8fdf929552621a75eb8fec94940037bdb6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.