Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22EE0088

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22EE0088","CLUSTER 1-CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS):  1. ALTERNATIVE LEARNING SYSTEM (ALS), MAGARA ROXAS  2. NIEVES BACOSA EVIO ELEMENTARY SCHOOL (FORMERLY PAMUAYAN ELEMENTARY SCHOOL), SAN VICENTE  3. GREEN ISLAND NATIONAL HIGH SCHOOL, ROXAS  4.","GAA 2021 CSSP","Completed",1377840.5,0,100,"Palawan 1st DEO","MIMAROPA Region","PANAAD CONSTRUCTION (37345)","2022-12-27","2023-04-21",2021,"Regular Infra - GAA 2021 CSSP",10.0456,119.17781,"1705318000","1705300000"]
SHA-256
b322f073971632942314e319a6becfdd7eaaad51011ee0ebfd33972ea13927f2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.