Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22EH0047

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22EH0047","CONSTRUCTION OF BONLAO FLOOD CONTROL STRUCTURE ALONG TABLAS CIRCUMFERENTIAL ROAD, STA. 0+133.20 - STA. 0+300 (L/S), ALCANTARA, ROMBLON","GAA 2022 OO-2","Completed",24361307.16,0,100,"Romblon DEO","MIMAROPA Region","ULTIMATE BUILDER'S & CONST. SUPPLY (39221)","2022-04-06","2022-10-10",2022,"Regular Infra - GAA 2022 OO-2",12.30091,122.07482,"1705901000","1705900000"]
SHA-256
b25e385f9d01580198c22763f89fcf680e9e7d7343aafc39bc7d623b9253361b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.