Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FC0170

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FC0170","CONSTRUCTION OF DAET RIVER CONTROL STRUCTURE (BRGY. VIII SECTION), BRGY. VIII, DAET, CAMARINES NORTE","GAA 2022 OO-2","On-Going",41321764.11,0,72.25,"Camarines Norte DEO","Region V","ARIK CONSTRUCTION (32786) / ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400)","2022-03-22",null,2022,"Regular Infra - GAA 2022 OO-2",14.1135,122.95798,"501603000","501600000"]
SHA-256
46d5ed9446803215c7dfb9a272f0bd3ea3ed530fbd6236e8b608b33f647443c6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.