Project 22FG0013
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FG0013","IMPROVEMENT OF FLOOD MITIGATION STRUCTURE ALONG HIMORAGAT RIVER, SECTION 1: STA.0+315.00 - STA.0+466.95(R/S) SECTION 2: STA.0+493.45 - STA.495.70(L/S) SECTION 3: STA.0+501.80 - STA.0+542.24(L/S) SECTION 4: STA.0+473.05 - STA.0+543.41(R/S) TINAMBAC CAM SUR","Flood Control and Drainage","Completed",29400000,0,100,"Camarines Sur 4th DEO","Region V","SHLA CONSTRUCTION AND SUPPLY (45590)","2022-02-15","2023-07-13",2022,"Regular Infra - GAA 2022 CSSP",13.81374,123.32543,"501737000","501700000"]
SHA-256
9c5119cdbdd336d4408b8a2dfc31ee54191c7e7f958fa79780a2e7c50a4489b1Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.