Project 22FI0034
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FI0034","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION/ IMPROVEMENT OF BAÑADERO RIVER CONTROL, STA.1+563 - STA.1+810 (DOWNSTREAM, RIGHT SIDE), MOBO, MASBATE","GAA 2022 OO-2","Completed",38149440,0,100,"Masbate 2nd DEO","Region V","ALGIMAR CONSTRUCTION CORPORATION (15232) / CL CARANDANG CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: CL CARANDANG ENTERPRISES) (29494)","2022-02-10","2022-06-23",2022,"Regular Infra - GAA 2022 OO-2",12.32687,123.66314,"504113000","504100000"]
SHA-256
1b5e94f73239915f3981559b154b9a5c0c66a303a02b0e6228b274533ff44571Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.